Overall, Metro Line 3 (Phase I) includes 22 stations, spanning from Shunde Station (formerly named as Shunde College Station) in the south to Zhenan Station in the north.
So far, station facility installation and furnishing have been running in smooth process, of which 93.42% has been done. 22 stations have all been inbuilt with 400V electricity. 4 battery engineering vehicles and 27 electric passenger cars have gone through the factory inspection. 21 trains have been shipped to Metro Line 3 (Phase I). As planned, the line will be put on trial operation within this year.
Author | Jersey
Revisor | Ivy, Eleanor
Photo | Foshan Daily